United States · POS · Energy · AI · Robotics contact@360xcel.com · Start a project
360XCEL Get in touch

Energy / Commercial solar

Arrays sized to your load — not a brochure kW.

Rooftop and ground-mount solar for American warehouses, campuses, and industrial parks, engineered from utility interval data and site constraints.

Rooftop Warehouse and canopy arrays
Ground Yard and industrial mounts
Sizing From utility interval data
Interconnect Clear ownership path
Commercial solar Commercial solar Commercial solar

Overview

Commercial solar facilities can run

Brochure kilowatts do not pay demand charges. 360XCEL sizes rooftop, canopy, and ground-mount arrays from utility interval data and real roof or yard constraints.

Warehouses, campuses, and industrial parks get interconnection ownership named early and ops docs facilities can explain upstairs — not a science project after the installer leaves.

We survey structure and shade, engineer to demand, and commission with a handover facilities will actually open on Monday morning.

Who this is for

Operators we build this with.

01

Warehouse & logistics

Large roofs and yards where load profiles and dock schedules drive design.

02

Campuses & buildings

Multi-building sites that need canopy or rooftop arrays with shared ops language.

03

C&I facilities

Plants and commercial sites that need interconnect ownership, not finger-pointing.

On the floor

Photography from live operating contexts.

Commercial solar — site 1
Commercial solar — site 2
Commercial solar — site 3
Commercial solar — site 4
Commercial solar — site 5
Commercial solar — site 6

Capabilities

Commercial solar facilities can run

We start from bills and roof reality, then deliver arrays that facilities teams can explain upstairs — with interconnection ownership in the plan.

  • Rooftop arrays for warehouses and big-box roofs
  • Parking canopy and ground-mount options
  • Load-profile sizing from utility data
  • Interconnection and commissioning support

How we deliver

Discover → pilot → commission → support.

  1. 01

    Assess

    Utility intervals, roof/yard constraints, and critical circuits define the design — not a brochure kW.

  2. 02

    Engineer

    Array, BESS, and EMS sized as one model with interconnection ownership named early.

  3. 03

    Commission

    Sequence protects loads; facilities gets a morning checklist, not a binder that gathers dust.

  4. 04

    Operate

    One escalation path across generation, storage, and monitoring.

Scope

What this engagement covers.

Site survey

Roof, structure, and shade constraints mapped.

Engineering

Array layout matched to real demand.

Interconnect

Utility path with named ownership.

Handover

Ops docs facilities actually use.

Outcomes

What “done” looks like on the floor.

Load-true sizing

Arrays matched to interval data and site constraints — not a sales slide.

Clear interconnect

Utility path with named ownership through permission to operate.

Facilities-ready handover

Docs and views operators can run without calling the EPC every week.

FAQ

Questions operators ask before kickoff.

How do you size the array?

From utility interval data and site survey — structure, shade, and real demand — not a generic kW quote.

Rooftop or ground mount?

We recommend from roof capacity, canopy opportunity, and yard space after survey.

Who owns interconnection?

Ownership is named in the plan. Facilities should not mediate three parties at PTO.

Can this pair with storage later?

Yes. Designs stay hybrid-ready when BESS is on the roadmap.

Have a roof or yard ready for solar?

Send a short brief. A producer replies the same business day. contact@360xcel.com

Ready to build?

Start a
project