United States · POS · Energy · AI · Robotics contact@360xcel.com · Start a project
360XCEL Get in touch

AI & Robotics / Warehouse robotics

AMRs and pick cells built for peak week.

Autonomous mobile robots and pick systems planned for real traffic — with UPH targets and safety zones before hardware lands.

UPH Metric before hardware
AMRs Aisle traffic planned
Pick Cells with safety zones
Scale Expand after first cell wins
Warehouse robotics Warehouse robotics Warehouse robotics

Overview

One process. One metric. Then scale.

Peak week is the exam. 360XCEL plans AMRs and pick cells for real aisle traffic with UPH targets and safety zones before hardware lands.

We automate one process first, prove the number, then expand fleet and cells. Safety fencing, interlocks, and operator training ship in the same plan as the robots.

Goods-to-person and pick patterns are designed for how your building already moves cartons — not a catalog layout that ignores docks and mezzanines.

Who this is for

Operators we build this with.

01

Fulfillment leaders

Centers that live or die on units-per-hour through peak.

02

Warehouse ops

Teams ready to automate one aisle or cell with a clear metric.

03

Safety & training owners

Groups that will not accept robots without zones and crew readiness.

On the floor

Photography from live operating contexts.

Warehouse robotics — site 1
Warehouse robotics — site 2
Warehouse robotics — site 3
Warehouse robotics — site 4
Warehouse robotics — site 5
Warehouse robotics — site 6

Capabilities

One process. One metric. Then scale.

We lock throughput, commission the first cell, then expand AMRs across the floor — safety and training in the same plan.

  • Warehouse AMRs and traffic design
  • Goods-to-person and pick patterns
  • Safety fencing and interlocks
  • Operator training before peak

How we deliver

Discover → pilot → commission → support.

  1. 01

    Lock metric

    Catch rate, UPH, or forecast usefulness is written before spend — not after a demo reel.

  2. 02

    Instrument

    Cameras, cells, or data feeds installed against live product and real traffic.

  3. 03

    Prove

    Pilot window with operators on shift; false-positive and safety budgets enforced.

  4. 04

    Scale

    Expand only after the first cell or line holds the number; named lead stays through ramp.

Scope

What this engagement covers.

Layout

Aisles and zones mapped for robots.

Cells

Pick systems with UPH targets.

Safety

Interlocks and training included.

Ramp

Scale only after the first cell hits number.

Outcomes

What “done” looks like on the floor.

UPH-first design

Throughput locked before fleet spend scales.

Safe cells

Fencing, interlocks, and training included — not optional add-ons.

Measured scale

Expand AMRs and cells only after the first win holds.

FAQ

Questions operators ask before kickoff.

Do you automate the whole warehouse at once?

No. One process, one metric, then scale — that is how peak week stays survivable.

Is safety included?

Yes. Zones, fencing, interlocks, and training are in the same plan as the robots.

How is UPH set?

Before hardware lands. We do not invent the target after the demo.

AMRs or pick cells?

Both are in scope; we recommend from your traffic, SKU mix, and layout survey.

Ready to automate an aisle or a pick cell?

Send a short brief. A producer replies the same business day. contact@360xcel.com

Ready to build?

Start a
project