United States · POS · Energy · AI · Robotics contact@360xcel.com · Start a project
360XCEL Get in touch

Energy / BESS

Storage that protects the circuits that cannot brown out.

Containerized battery energy storage for peak shaving and backup — scaled to the site so overnight and demand windows stay covered.

Peak Demand charge reduction
Backup Critical circuit cover
Scale Containerized growth
Hybrid Pairs cleanly with solar
Battery storage (BESS) Battery storage (BESS) Battery storage (BESS)

Overview

BESS built for operators, not demos

Peak windows and critical circuits decide whether storage earns its pad. 360XCEL deploys containerized BESS for demand charge reduction and backup — scaled to the loads that cannot brown out.

Siting, clearance, and dispatch logic are planned with the same crew that owns solar and EMS when hybrid is in play — one support narrative.

Safety and commissioning sit in the same package as capacity so facilities is not inventing procedures after energization.

Who this is for

Operators we build this with.

01

C&I energy managers

Sites fighting demand charges and needing controllable discharge windows.

02

Facilities with critical loads

Operations that need backup on named circuits, not whole-site theater.

03

Hybrid projects

Teams pairing storage with solar under one commissioning plan.

On the floor

Photography from live operating contexts.

Battery storage (BESS) — site 1
Battery storage (BESS) — site 2
Battery storage (BESS) — site 3
Battery storage (BESS) — site 4
Battery storage (BESS) — site 5
Battery storage (BESS) — site 6

Capabilities

BESS built for operators, not demos

We size storage to the loads that matter and commission it with the same team that owns solar and EMS — one support path.

  • Containerized BESS for C&I sites
  • Peak shaving for demand charges
  • Backup for critical circuits
  • Clear safety and commissioning plan

How we deliver

Discover → pilot → commission → support.

  1. 01

    Assess

    Utility intervals, roof/yard constraints, and critical circuits define the design — not a brochure kW.

  2. 02

    Engineer

    Array, BESS, and EMS sized as one model with interconnection ownership named early.

  3. 03

    Commission

    Sequence protects loads; facilities gets a morning checklist, not a binder that gathers dust.

  4. 04

    Operate

    One escalation path across generation, storage, and monitoring.

Scope

What this engagement covers.

Sizing

Matched to peak and backup windows.

Siting

Yard, pad, and clearance planned.

Controls

Dispatch logic facilities can follow.

Support

Same crew as solar and EMS.

Outcomes

What “done” looks like on the floor.

Peak shaving discipline

Dispatch aimed at the demand windows that actually hit the bill.

Critical-circuit cover

Backup scoped to circuits that must stay up.

Unified support

Same path as solar and EMS — not three vendors arguing overnight.

FAQ

Questions operators ask before kickoff.

Is this whole-site backup?

We size to peak shaving and named critical circuits — scope is explicit so expectations match physics.

Containerized or custom?

Containerized BESS is the default for C&I speed and clarity; siting and clearance are surveyed first.

How does dispatch work?

Controls are written so facilities can follow the logic — not a black box that only the vendor understands.

Can it run with solar?

Yes. Hybrid engagements commission generation and storage together.

Need peak shaving or critical-circuit backup?

Send a short brief. A producer replies the same business day. contact@360xcel.com

Ready to build?

Start a
project